Product: Jiade Li 3-in-1 Wall Paint
Model: ZMN6030-CK
Specification: 20kg/barrel; 25kg/barrel
Consumption: 0.15kg-0.2kg/square meter
【Scrub Resistance Cycles】Compliant with National Standards
Product Brief: As a cost-effective and value-for-money eco-friendly interior wall paint, Woodpecker Jiade Li 3-in-1 Wall Paint is refined with a unique bright white formula and odor-free technology. Its paint film delivers an ultra-white and smooth effect, with long-lasting bright color, and features mildew resistance, alkali resistance, and scrub resistance. It can easily resist humid environments, making it the first choice for economical interior wall coating.
Product Features
Bamboo charcoal for odor removal and degradation of harmful substances
Formaldehyde purification for long-lasting fresh air
Ultra-low VOC and ultra-low odor
Mildew resistance, alkali resistance, bacteria inhibition and anti-chalking
Super scrub resistance with long-lasting bright appearance
Technical Specifications
Gloss: Matte
Construction Methods: Brushing, Rolling, Airless Spraying
Dilution Ratio:
Brushing/Rolling: Add 10%-20% clean water
Airless Spraying: Add 5%-10% clean water
Theoretical Paint Consumption: 8-10 square meters per kg per coat (actual consumption may vary depending on the roughness of the base and construction process)
Recommended Optimal Coating System
Primer: 1 coat of Woodpecker All-Purpose Alkali-Resistant Sealing Primer
Topcoat: 2 coats of Woodpecker Jiade Li 3-in-1 Wall Paint
Construction Instructions
1.Before construction, ensure the wall humidity is less than 10% and the pH value is less than 10. For new walls, the putty layer should be applied with high-end multi-functional waterproof interior wall putty, then sanded smooth with 400-mesh sandpaper and dust-removed before construction. This ensures the optimal paint film effect.
2.For old wall renovation, ensure the wall is free of oil stains and loose materials. Remove cracked old paint film, fill defects with appropriate putty, sand smooth, remove dust, and then proceed with construction according to the process.
3.Use high-quality construction tools. New wool brushes should be cleaned with a suitable detergent to remove grease before use. Rollers must be used with a matching tray, and high-quality short-pile rollers are recommended.
4.Stir the paint thoroughly and filter before use. Keep the barrel lid tightly closed during construction intervals to prevent skinning. Do not pour diluted paint back into the original container.
5.The recoating interval should be at least 2 hours (at 25°C, subject to touch-dry condition). In winter, the recoating interval should be appropriately extended.
6.Do not conduct construction work when the temperature is below 5°C and the relative humidity exceeds 85%.
7.When applying dark or bright-colored products, strictly control the dilution ratio within 20% and appropriately increase the number of coats to ensure the best effect.
Storage Instructions
This product is an eco-friendly water-based coating. It should be stored in a cool and dry place with the temperature controlled between 0°C and 25°C. Avoid direct sunlight or low-temperature storage.
Name: Xi Wang
Mobile:+8613842980814
Tel:+8613842980814
Whatsapp:+8613842980814
Email:vip@woodpeckerpaint.com
Add:No. 5, East Section of Yanshan Road, Area A, Dongdaihe New District, Suizhong County, Huludao City, Liaoning Province, China