Home      Products     Interior Wall Paint / Interior Emulsion Paint       Woodpecker Vichy Bamboo Charcoal 5-in-1
  • Woodpecker Vichy Bamboo Charcoal 5-in-1 Wall Paint

Woodpecker Vichy Bamboo Charcoal 5-in-1 Wall Paint


Product: Vichy Bamboo Charcoal 5-in-1 Wall Paint

Model:  ZMN6040A-CK

Specification:  20kg/barrel; 25kg/barrel

Consumption:  0.15kg-0.2kg/square meter

Product Brief: Adopting the latest odor-free technology, Woodpecker Vichy Bamboo Charcoal 5-in-1 Wall Paint is made from high-grade titanium dioxide, odor-free emulsion and bamboo charcoal factors. It can effectively decompose and adsorb harmful substances such as formaldehyde, ether and sulfides, and has the function of purifying the air. This keeps the indoor air fresher and more eco-friendly, easily creating a natural and pure living space.


Product Features

Bamboo charcoal for odor removal and degradation of harmful substances

Formaldehyde purification for long-lasting fresh air

Ultra-low VOCs and ultra-low odor

Mildew resistance, alkali resistance, bacteria inhibition and anti-chalking

Super scrub resistance with long-lasting bright appearance


Technical Specifications

Gloss: Matte

Construction Methods: Brushing, Rolling, Airless Spraying

Dilution Ratio:

Brushing/Rolling: Add 10%-20% clean water

Airless Spraying: Add 5%-10% clean water

Theoretical Paint Consumption: 8-10 square meters per kg per coat (actual consumption may vary depending on the roughness of the base and construction process)

Recommended Optimal Coating System

Primer: 1 coat of Woodpecker All-Purpose Alkali-Resistant Sealing Primer

Topcoat: 2 coats of Woodpecker Weizi Bamboo Charcoal 5-in-1 Wall Paint

Construction Instructions

1.Before construction, ensure the wall humidity is less than 10% and the pH value is less than 10. For new walls, the putty layer should be applied with high-end multi-functional waterproof interior wall putty, then sanded smooth with 400-mesh sandpaper and dust-removed before construction. This ensures the optimal paint film effect.

2.For old wall renovation, ensure the wall is free of oil stains and loose materials. Remove cracked old paint film, fill defects with appropriate putty, sand smooth, remove dust, and then proceed with construction according to the process.

3.Use high-quality construction tools. New wool brushes should be cleaned with a suitable detergent to remove grease before use. Rollers must be used with a matching tray, and high-quality short-pile rollers are recommended.

4.Stir the paint thoroughly and filter before use. Keep the barrel lid tightly closed during construction intervals to prevent skinning. Do not pour diluted paint back into the original container.

5.The recoating interval should be at least 2 hours (at 25°C, subject to touch-dry condition). In winter, the recoating interval should be appropriately extended.

6.Do not construct when the temperature is below 5°C or the relative humidity exceeds 85%.

7.When applying dark or bright-colored products, strictly control the dilution ratio within 20% and appropriately increase the number of coats to ensure the best effect.


Storage Instructions

This product is an eco-friendly water-based coating. It should be stored in a cool and dry place with the temperature controlled between 0°C and 25°C. Avoid direct sunlight or low-temperature storage.


INQUIRY

CATEGORIES

CONTACT US

Name: Xi Wang

Mobile:+8613842980814

Tel:+8613842980814

Whatsapp:+8613842980814

Email:vip@woodpeckerpaint.com

Add:No. 5, East Section of Yanshan Road, Area A, Dongdaihe New District, Suizhong County, Huludao City, Liaoning Province, China